Required Process:
Process reliable manual workstation for 2 Operators for the assembly of oil-pumps for combustion engines
Work Station 1:
- The individual parts are loaded into the part fixture.
- Manual assembly of piston and spring
- Insertion and tightening of the locking screw
- Placement of sleeves, shaft and cover
- Tightening of the pump housing with an EC-Screwdriver.
A Position Control Stand of each screw-assembly - Assembly of Bevel-Gears
- Screw-tightening of tooth-gears to the shaft using an EC-Screwdriver
- Marking of the pump-housing (punch-marking)
- Only when all parts are present and the screwdriving sequence has been followed, will the part fixture release the assembly.
- Removal of the pre-assembled part
Work Station 2:
- Loading of the pre-assembled part
- Mounting of the gear-sets and the cover (A)
- Tightening of the Cover (A) with the pump housing
A Position Control Stand of each screw-assembly. - Insert center-bushings, filter-foil and cover (B)
- Presence control of the filter-foil
- Assembly of the cover (B) with the pump housing.
A Position Control Stand of each screw-assembly - Marking of the pump-housing (punch-marking)
- Only when all parts are present and the screwdriving sequence has been followed, will the part fixture release the finished oil-pump.
- Unloading of the oil-pump by the Operator
The workstation base is height-adjustable and can be changed to accommodate each individual operator’s height, using a remote control.